This machine is built for controlled concrete pile head removal and smoother site operation. It helps contractors save time, lower labor costs, and improve consistency across foundation pile treatment work.
As a professional manufacturer of Concrete Pile Breaker, we provide more cost-effective products. Whether you want to buy or become a distributor, you are welcome to contact us anytime.
Cable Drum Trailer
Concrete Pile Breaker is designed for removing concrete pile heads quickly and with better control on foundation jobs. It applies hydraulic force around the pile so crews can break away the upper section more evenly and prepare the remaining pile for the next construction step. This approach helps reduce rough manual demolition and supports cleaner work around the pile top.
A Concrete Pile Breaker is widely used on cast-in-place pile projects where contractors need steady performance and repeatable results. It is suitable for housing foundations, commercial developments, bridge construction, port work, rail infrastructure, and large civil engineering projects. The machine helps expose reinforcement in a more orderly way and can reduce unnecessary damage around the finished pile section. Contractors value it because it improves efficiency while keeping pile head treatment more organized and easier to manage.
Compared with slower traditional methods, a Concrete Pile Breaker supports better productivity and lower labor intensity. It helps teams process many piles with more consistency and less disruption to the workflow. For contractors who want a reliable system for concrete pile head removal, this equipment offers a practical and efficient solution that fits demanding jobsite conditions and modern foundation work requirements.
| Product Model | Working Pressure | Maximum Breaking Force | Safe Stroke | Chisel Diameter | Pile Breaking Height |
| PZJ | 35 | 60 | 200 | 110 | ≤500 |
| Applicable Carrier (t) | Recommended Flow (L/min) | Single Pile Breaking Time (s) | Pile Diameter (mm) |
| 20–30 | 200 | 20–50 | 600–800 |
| 20–30 | 200 | 20–50 | 800–1000 |
| 20–30 | 200 | 20–50 | 1000–1150 |
| 20–30 | 200 | 20–50 | 1150–1300 |
| Applicable Carrier (t) | Recommended Flow (L/min) | Single Pile Breaking Time (s) | Pile Diameter (mm) |
| 30–40 | 300 | 30–60 | 1300–1480 |
| 30–40 | 300 | 30–60 | 1500–1650 |
| 30–40 | 300 | 30–60 | 1650–1800 |
| 30–40 | 300 | 30–60 | 1800–1980 |
| 30–40 | 300 | 30–60 | 2000–2200 |
| Applicable Carrier (t) | Recommended Flow (L/min) | Single Pile Breaking Time (s) | Pile Diameter (mm) |
| 40–50 | 350 | 30–80 | 2200–2350 |
| 40–50 | 350 | 30–80 | 2350–2500 |
| 40–50 | 350 | 30–80 | 2500–2650 |
| 40–50 | 350 | 30–80 | 2650–2800 |
The hydraulic pile breaker is lifting and breaking a large concrete pile head inside a deep excavation pit. |
![]() |
The pile cutter is removing a concrete pile head on a dry construction site with clear access around the pile. |
A pile head breaker is crushing a reinforced concrete pile head and exposing the internal rebars. |
The hydraulic pile cutter is breaking a concrete pile head in a waterlogged excavation area. |
Top view of a concrete pile cutter working around a pile head during foundation pile trimming. |
The pile cropper is lifting a separated pile head from a cast-in-place concrete pile. |
Front view of a pile crusher breaking a reinforced concrete pile head on a construction site. |