Bazhou Dpair Hardware Tools Co., LTD.

Pile Crusher for Reinforced Concrete Pile Head Demolition

Designed to crush and remove concrete pile heads efficiently, this machine helps reduce labor intensity and improve productivity on foundation projects that require repeated pile top treatment.

As a professional manufacturer of Pile Crusher, we provide more cost-effective products. Whether you want to buy or become a distributor, you are welcome to contact us anytime.

Cable Drum Trailer

Pile Crusher is used to break and crush the upper section of reinforced concrete piles during foundation construction. It delivers controlled force around the pile head so contractors can remove excess concrete more efficiently and prepare the pile for the next stage of work. This process improves working speed and gives crews a more organized method than slow, labor-intensive manual demolition.

On cast-in-place pile jobs, a Pile Crusher helps contractors manage repetitive pile head treatment with better consistency. It is suitable for building foundations, transport infrastructure, industrial projects, marine works, and other heavy civil applications. The machine supports cleaner exposure of steel reinforcement and helps limit unwanted damage around the remaining pile body. That makes the work easier to control and improves the overall appearance and quality of the treated pile top.

Many contractors choose a Pile Crusher because it reduces physical labor, saves time, and supports a more productive jobsite routine. It also helps teams keep pile removal work cleaner and more efficient when deadlines are tight. For companies that need a practical solution for crushing concrete pile heads, this equipment provides a dependable and jobsite-ready option for modern foundation work.

PZJ Pile Breaker Specifications

Product Model Working Pressure Maximum Breaking Force Safe Stroke Chisel Diameter Pile Breaking Height
PZJ 35 60 200 110 ≤500

Applicable Carrier (t) Recommended Flow (L/min) Single Pile Breaking Time (s) Pile Diameter (mm)
20–30 200 20–50 600–800
20–30 200 20–50 800–1000
20–30 200 20–50 1000–1150
20–30 200 20–50 1150–1300

Applicable Carrier (t) Recommended Flow (L/min) Single Pile Breaking Time (s) Pile Diameter (mm)
30–40 300 30–60 1300–1480
30–40 300 30–60 1500–1650
30–40 300 30–60 1650–1800
30–40 300 30–60 1800–1980
30–40 300 30–60 2000–2200

Applicable Carrier (t) Recommended Flow (L/min) Single Pile Breaking Time (s) Pile Diameter (mm)
40–50 350 30–80 2200–2350
40–50 350 30–80 2350–2500
40–50 350 30–80 2500–2650
40–50 350 30–80 2650–2800

 

hydraulic pile breaker removing concrete pile head in deep foundation pitThe hydraulic pile breaker is lifting and breaking a large concrete pile head inside a deep excavation pit.
concrete pile breaker cutting round pile head in muddy construction site
A concrete pile breaker is operating in a muddy jobsite to remove the top section of a round foundation pile.
pile cutter removing concrete pile head on dry construction siteThe pile cutter is removing a concrete pile head on a dry construction site with clear access around the pile.
pile head breaker crushing reinforced concrete pile head with exposed rebarA pile head breaker is crushing a reinforced concrete pile head and exposing the internal rebars.
hydraulic pile cutter breaking concrete pile head in waterlogged excavationThe hydraulic pile cutter is breaking a concrete pile head in a waterlogged excavation area.
concrete pile cutter top view during foundation pile head removalTop view of a concrete pile cutter working around a pile head during foundation pile trimming.
pile cropper lifting separated concrete pile head from foundation pileThe pile cropper is lifting a separated pile head from a cast-in-place concrete pile.
pile crusher breaking reinforced concrete pile head on construction siteFront view of a pile crusher breaking a reinforced concrete pile head on a construction site.

 

Outbound link:

Youtube:John’s Excavator Bucket in China – YouTube

 

internal link:

Produce:We Produces

Online inquiry