Made for cleaner concrete pile top removal, this machine helps contractors improve cutting consistency, reduce manual demolition effort, and speed up foundation site work.
As a professional manufacturer of Concrete Pile Cutter, we provide more cost-effective products. Whether you want to buy or become a distributor, you are welcome to contact us anytime.
Cable Drum Trailer
Concrete Pile Cutter is designed to trim and remove pile tops in a cleaner and more efficient way. It works around the concrete pile head to separate the unwanted upper section while helping crews maintain better control throughout the removal process. This improves site efficiency and creates a more organized workflow for follow-up foundation operations.
Contractors use a Concrete Pile Cutter on cast-in-place pile projects that require dependable pile head treatment across multiple locations on the jobsite. It is suitable for residential developments, commercial buildings, bridges, industrial facilities, and public infrastructure works. The machine helps expose rebars more neatly and can reduce unnecessary damage around the remaining pile section. It also lowers physical workload and supports a more repeatable cutting result from pile to pile.
Compared with rough manual breaking, a Concrete Pile Cutter offers better consistency and faster production. It helps crews complete pile top removal with less disruption and better site control. For companies that need an efficient method for concrete pile trimming, this equipment is a practical solution for cleaner results, improved productivity, and reliable performance in modern foundation construction.
| Product Model | Working Pressure | Maximum Breaking Force | Safe Stroke | Chisel Diameter | Pile Breaking Height |
| PZJ | 35 | 60 | 200 | 110 | ≤500 |
| Applicable Carrier (t) | Recommended Flow (L/min) | Single Pile Breaking Time (s) | Pile Diameter (mm) |
| 20–30 | 200 | 20–50 | 600–800 |
| 20–30 | 200 | 20–50 | 800–1000 |
| 20–30 | 200 | 20–50 | 1000–1150 |
| 20–30 | 200 | 20–50 | 1150–1300 |
| Applicable Carrier (t) | Recommended Flow (L/min) | Single Pile Breaking Time (s) | Pile Diameter (mm) |
| 30–40 | 300 | 30–60 | 1300–1480 |
| 30–40 | 300 | 30–60 | 1500–1650 |
| 30–40 | 300 | 30–60 | 1650–1800 |
| 30–40 | 300 | 30–60 | 1800–1980 |
| 30–40 | 300 | 30–60 | 2000–2200 |
| Applicable Carrier (t) | Recommended Flow (L/min) | Single Pile Breaking Time (s) | Pile Diameter (mm) |
| 40–50 | 350 | 30–80 | 2200–2350 |
| 40–50 | 350 | 30–80 | 2350–2500 |
| 40–50 | 350 | 30–80 | 2500–2650 |
| 40–50 | 350 | 30–80 | 2650–2800 |
The hydraulic pile breaker is lifting and breaking a large concrete pile head inside a deep excavation pit. |
![]() |
The pile cutter is removing a concrete pile head on a dry construction site with clear access around the pile. |
A pile head breaker is crushing a reinforced concrete pile head and exposing the internal rebars. |
The hydraulic pile cutter is breaking a concrete pile head in a waterlogged excavation area. |
Top view of a concrete pile cutter working around a pile head during foundation pile trimming. |
The pile cropper is lifting a separated pile head from a cast-in-place concrete pile. |
Front view of a pile crusher breaking a reinforced concrete pile head on a construction site. |
Outbound link:
Youtube:John’s Excavator Bucket in China – YouTube
internal link:
Produce:We Produces















