Tie Layer helps railroad crews place concrete ties with controlled movement and efficient handling. It supports cleaner installation workflow, reduces manual effort, and keeps tie placement more consistent across new build and improvement projects.
As a professional manufacturer of Tie Layer, we provide more cost-effective products. Whether you want to buy or become a distributor, you are welcome to contact us anytime.
Cable Drum Trailer
A Tie Layer gives railroad crews a direct way to place concrete ties during track installation and improvement work. It helps operators move heavy ties with controlled lifting and steady lowering. On jobs that require repeated handling, better control keeps the process organized. Crews can maintain a cleaner workflow, reduce unnecessary manual effort, and keep the tie placement sequence moving at a steady pace. This is valuable on new line construction, siding projects, yard expansion, and other sites where concrete ties must be handled quickly but still positioned with care.
In real site conditions, a Tie Layer helps crews work faster without losing control of the job. It supports better tie handling, smoother installation flow, and more reliable placement from one work section to the next. That helps contractors maintain output while keeping the operation practical and well organized.
|
Item |
Specification |
| Equipment Name |
Sleeper Laying Machine |
|
Suitable Carrier (t) |
18–30 |
| Recommended Flow (L/min) |
70 |
|
Rotational Speed (rpm) |
— |
| Working Pressure (MPa) |
24 |
|
Load Capacity (kg) |
2100 |
| Working Width (mm) |
— |
|
Sleeper Capacity |
4 |
| Rotation Angle (°) |
360 |
|
Tilt Angle (°) |
— |
| Machine Weight (kg) |
1450 |
![]() |
![]() |
![]() |
![]() |
Outbound link:
Youtube:John’s Excavator Bucket in China – YouTube
internal link:
Produce:We Produces















