Bazhou Dpair Hardware Tools Co., LTD.

Tie Exchanger

Tie Exchanger gives rail projects a practical way to exchange concrete ties with controlled movement and stable handling. It supports efficient renewal work and helps crews manage change-out cycles more smoothly.

As a professional manufacturer of Tie Exchanger, we provide more cost-effective products. Whether you want to buy or become a distributor, you are welcome to contact us anytime.

Cable Drum Trailer

A Tie Exchanger gives railroad projects a practical way to exchange concrete ties in a controlled and repeatable process. Renewal work often involves moving old and new units through a limited work area while keeping the schedule on track. Equipment that supports a clean exchange cycle can improve both pace and organization. This machine helps crews handle replacement ties more efficiently, reduce manual effort, and maintain better coordination between operator and ground team. It is a useful option for companies that want smoother change-out workflow on active rail sites.

In everyday renewal work, a Tie Exchanger helps companies improve efficiency without sacrificing control. It supports cleaner tie movement, more dependable exchange cycles, and stronger productivity on railroad projects where organized replacement work matters. It is a clear product category for buyers who focus on rail maintenance performance.

Product Parameter

Item

Specification
Equipment Name

Sleeper Laying Machine

Suitable Carrier (t)

18–30
Recommended Flow (L/min)

70

Rotational Speed (rpm)

Working Pressure (MPa)

24

Load Capacity (kg)

2100
Working Width (mm)

Sleeper Capacity

4
Rotation Angle (°)

360

Tilt Angle (°)

Machine Weight (kg)

1450

Tie Layer handling concrete railroad ties at construction site
Tie Layer handling concrete ties beside the prepared rail bed.
Hydraulic Sleeper Placer/Spacer lifting concrete sleepers outdoors
Hydraulic Sleeper Placer/Spacer lifting concrete sleepers with stable hydraulic control at the job site.
Sleeper Laying Machine positioning a concrete sleeper on rails
Sleeper Laying Machine placing a concrete sleeper on the railway track.
Sleeper Exchanger lifting multiple concrete sleepers for rail renewal
Sleeper Exchanger lifting multiple concrete sleepers during large-scale rail renewal work.

Outbound link:

Youtube:John’s Excavator Bucket in China – YouTube

internal link:

Produce:We Produces

Online inquiry