Side Clamp Vibratory Hammer combines controlled side clamping and vibratory pile work for efficient installation and extraction in demanding foundation projects.
As a professional manufacturer of Side Clamp Vibratory Hammer, we provide more cost-effective products. Whether you want to buy or become a distributor, you are welcome to contact us anytime.
Cable Drum Trailer
Side Clamp Vibratory Hammer is a strong product phrase for pages that emphasize both the clamping style and the vibratory hammer function. This wording is useful when you want buyers to understand the equipment type quickly without relying on a long explanation in the title. A Side Clamp Vibratory Hammer page should present the machine as a practical excavator-mounted solution for gripping piles from the side, positioning them with control, driving them with vibration, and extracting them when the work is complete. That direct message helps the page feel relevant to project buyers, dealers, and contractors from the first line.
|
Model |
DPAIR100 |
| Power Unit Model |
GX280 |
|
Suitable Pile Size (mm) |
400 |
| Power (kW) |
150 |
|
Max. Pressing Force (T) |
80 |
| Rated Speed (r/min) |
2000 |
|
Max. Extraction Force (T) |
100 |
| Max. Flow Rate (L/min) |
280 |
|
Stroke (mm) |
800 |
| Max. Oil Pressure (MPa) |
38 |
|
Main Machine Weight (kg) |
8500 |
| Power Unit Weight (kg) |
5800 |
|
Reaction Base Weight (kg) |
2500 |
| Travel Speed (km/h) |
1.4 |
|
Operation Method |
Wireless Remote Control |
| Dimensions (L × W × H) (mm) |
3500 × 1800 × 2400 |
![]() |
![]() |
![]() |
![]() |
Youtube:John’s Excavator Bucket in China – YouTube
internal link:
Produce:We Produces















