Bazhou Dpair Hardware Tools Co., LTD.

Side Grip Vibratory Hammer for Precision Pile Work

Side Grip Vibratory Hammer combines side gripping and vibratory action to support controlled pile handling, installation, and removal in modern foundation projects.

As a professional manufacturer of Side Grip Vibratory Hammer, we provide more cost-effective products. Whether you want to buy or become a distributor, you are welcome to contact us anytime.

Cable Drum Trailer

Side Grip Vibratory Hammer is one of the most natural product phrases for a page that targets excavator-mounted piling equipment with vibratory action and side grip handling. The wording is clear, professional, and suitable for buyers who already know the category they need. It works especially well for WooCommerce pages because it sounds like a real product name instead of a loose collection of keywords. A good Side Grip Vibratory Hammer page should speak about control, working range, handling convenience, and site adaptability in a way that feels practical to contractors, engineering buyers, and distributor partners.

Model

DPAIR100

Power Unit Model

GX280

Suitable Pile Size (mm)

400
Power (kW)

150

Max. Pressing Force (T)

80
Rated Speed (r/min)

2000

Max. Extraction Force (T)

100
Max. Flow Rate (L/min)

280

Stroke (mm)

800
Max. Oil Pressure (MPa)

38

Main Machine Weight (kg)

8500
Power Unit Weight (kg)

5800

Reaction Base Weight (kg)

2500
Travel Speed (km/h)

1.4

Operation Method

Wireless Remote Control
Dimensions (L × W × H) (mm)

3500 × 1800 × 2400

 

side grip pile driver clamping steel pile on construction site
Side grip vibratory pile driver clamping a steel pile during foundation work.
excavator mounted vibratory hammer driving pile on site
Excavator mounted vibratory hammer installing a pile on an open jobsite.
side grip sheet pile driver positioning pile with excavator
Side grip sheet pile driver positioning a pile section with excavator control.
side grip vibratory hammer gripping steel pipe pile
Side clamp pile driver operating vertically during a piling job.

Youtube:John’s Excavator Bucket in China – YouTube

internal link:

Produce:We Produces

Online inquiry